Our Process

How We Work

Every project follows the same four steps. No shortcuts, no surprises. A clear process from first call to final handover.

Key Takeaways

The Kraftwerk Protocol is a fixed four-step renovation process — site audit, team and materials planning, build, and final inspection — applied to every project without exception.

  • A dedicated site foreman is assigned at phase 2 and remains reachable directly throughout the build — no subcontractor chain to navigate.
  • Clients receive daily photo progress reports during phase 3, with materials and timelines locked in writing before work begins.
  • Phase 4 includes a 100-point systems inspection and a full documentation package covering MEP, finishes, and warranties.
Process at a Glance

Our 4-Step Protocol

PhaseFocusOutput
01Site Audit & MeasurementsWe visit your property, take exact measurements, and document everything before quoting.Scoped project + detailed quote
02Team & MaterialsYour dedicated foreman is assigned. Specialist teams are booked. Materials are sourced and confirmed.Assigned foreman + locked schedule
03BuildWork begins. You get daily photo updates and can reach your foreman directly at any time.Daily photo reports + quality checkpoints
04Inspect & HandoverWe run a 100-point inspection. Every defect is fixed before you get the keys.100-point inspection + documentation
01

Site Audit & Measurements

We visit your property, take exact measurements, and document everything before quoting.

  • Full structural assessment
  • Laser-precise measurements
  • Material and logistics planning
02

Team & Materials

Your dedicated foreman is assigned. Specialist teams are booked. Materials are sourced and confirmed.

  • Dedicated site foreman assigned
  • Specialist teams booked (electrical, HVAC)
  • Supply chain locked in
03

Build

Work begins. You get daily photo updates and can reach your foreman directly at any time.

  • Daily photo progress reports
  • Strict quality checkpoints
  • Direct foreman contact
04

Inspect & Handover

We run a 100-point inspection. Every defect is fixed before you get the keys.

  • 100-point systems inspection
  • All defects resolved before handover
  • Full documentation package delivered
Process Highlights
  • Every Kraftwerk renovation is led by a dedicated site foreman, reachable directly throughout the build — no subcontractor chain to navigate.
  • Clients receive daily photo progress reports from the site and can reach their foreman by phone or WhatsApp at any time during the build.
  • Final handover at Kraftwerk includes a 100-point systems inspection and a complete documentation package covering MEP, finishes, and warranties.
Process Questions

Frequently Asked Questions

What happens during the Kraftwerk site audit?

We visit your property, take exact measurements, and document everything before quoting. Full structural assessment. Laser-precise measurements. Material and logistics planning.

How does Kraftwerk plan team and materials?

Your dedicated foreman is assigned. Specialist teams are booked. Materials are sourced and confirmed. Dedicated site foreman assigned. Specialist teams booked (electrical, HVAC). Supply chain locked in.

What happens during the build phase?

Work begins. You get daily photo updates and can reach your foreman directly at any time. Daily photo progress reports. Strict quality checkpoints. Direct foreman contact.

How does Kraftwerk handle inspection and handover?

We run a 100-point inspection. Every defect is fixed before you get the keys. 100-point systems inspection. All defects resolved before handover. Full documentation package delivered.

Next Step

Ready to start?

Tell us about your project. We'll get back to you within 24 hours.

Message Us